A bunch of sanding today and gluing. While I was at it, decided to attack a few spots that needed fixing. For example, when planing one of the members of the subspar, I uncovered a knot in the wood. This meant that this member had to be removed and replaced in entirety or a section spliced in. Since it was at one end of the subspar, I elected to splice a section in as per AC43-13. Similarly, I did a few repairs on other sections of ribs.
Added cap strips to N3 rib and epoxied into place.